Active Projects
Engineering Services for North Campus Electrical Phase 2
Infrastructure
Post-Bid
Aurora, CO
Front Range Power Plant Outage - High Energy Piping Inspection and Hanger Repair
Renovation
Post-Bid
CO
Boulder Streetlight Ownership: Separation, Design, Construction and O&M
Post-Bid
Boulder, CO
Horizon Substation Control Enclosure
SEP Nixon-Fountain 115Kv and Fountain-Bradley 115KV Transmission Reconductor D/B
Electrical Transmission Services Substation - Professional Engineering Services
The Plum Creek to Rueter-Hess Reservoir Pipeline Infrastructure Project
Community Microgrid and Distributed Generation Plan
Civil and Electrical Design Services for Red Brick West and North Circuit
Transformer and Arms Standardization
Phased Right, Inc dba NEI Electric Power
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Clifton Oertli | (303) | @.com |