Active Projects
Switchgear, Preventive Maintenance, Repair and Replacement of Electrical Distribution Equipment
Alteration
Post-Bid
IL
Emergency Generator Upgrades
Alteration
Post-Bid
Berwyn, IL 60402
Water Treatment Plant Engine Generator
Alteration
Post-Bid
Western Springs, IL 60558
Light Pole Replacement
Bataan Park Walk Path Light Poles
Transition Building Build Out
ABS Electric
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Peter Lucnik Jr. | (815) | @.net | ||||||||
Renee Burns | (815) | @.net |