Active Projects
Water, Sanitary Sewer, and Drainage to Serve Breckenridge East Sections 6 and 7
Infrastructure
Post-Bid
TX
Cordillera Ranch Unit 304 and Cordillera Springs Offsite Utility Lines
Infrastructure
Post-Bid
TX
HDPE Culvert Pipe
Infrastructure
Results
TX
Waterworks Fittings and Materials
Fire Hydrants and Parts
ACT Pipe and Supply
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Brandon Clement | ![]() | (210) ![]() | ![]() | ![]() ![]() | ||||||
Clinton Stafford | ![]() | (210) ![]() | ![]() | ![]() ![]() | ||||||
David Shaw | ![]() | (210) ![]() | ![]() | ![]() ![]() | ||||||
Jeff Fields | ![]() | (210) ![]() | ![]() | ![]() ![]() | ||||||
Lea Davis | ![]() | (210) ![]() | ![]() | ![]() ![]() | ||||||
Mobin Sadeq | ![]() | (210) ![]() | ![]() | ![]() ![]() | ||||||
Raul De Leon | ![]() | (210) ![]() | ![]() | ![]() ![]() | ||||||
Stuart Davis | ![]() | (210) ![]() | ![]() | ![]() ![]() |