Active Projects
Il Route 154-13 Sidewalk and Drainage Improvements
Infrastructure
Post-Bid
Pinckneyville, IL
Granite City Harbor Rail Expansion
Infrastructure
Post-Bid
Granite City, IL
2021 Warehouse Tuckpointing
Alteration
Post-Bid
Granite City, IL 62040
Construction of a Shared-Use Path Along Il 157 from Lewis Road to the Goshen Trail Pedestrian Tunnel Under Il 157 in Edwardsville
Pavement Reconstruction, New Sidewalks and Drainage Improvements on North Prairie Street from Corbin Street to Dorothy Street in Bethalto
North Market Street Sidewalk
Venita Drive Reconstruction
Pavement Reconstruction
Earth Excavation
Pedestrian Path alogn South Market Street from IL 3 to Bulldog Boulevard in Waterloo.
Baxmeyer Construction, Inc.
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
DEBRA NOBBE | (618) | @.com | ||||||||
Josh Froese | (618) | @.com |