Construction of a Soil-cement Base Course With a Hma Overlay and Aggregate Shoulders on Dundas Lane
Infrastructure
Bidding
$2,000,000 est. value
Dundas, IL 62425
Oak Street 8 Inch Concrete Pavement
Infrastructure
Post-Bid
$740,000 est. value
Farina, IL 62838
Bituminous Materials Seal Coat, Seal Coat Aggregate - Furnish and Apply
Infrastructure
Post-Bid
$300,000 est. value
Noble, IL
Phase Vl-A and Vl-B Projects Including Pipe Culvert, Riprap, Tree and Brush Clearing, Elevated Walkway, Concrete Sidewalk, and Miscellaneous Items
Granular Culvert Backfill, Structure Excavation
Sidewalk Construction, Reconstruct Existing Driveways, Combination Curb and Gutter, Pavement Markings, and Pedestrian Traffic Signal Improvements
Bituminous Materials and Seal Coat
Bituminous Materials Seal Coat
Construction of Three Precast Concrete Box Culverts With Approach Roadway Work 2 Miles Southwest of Toledo
New Parking Lot