Active Projects
Engineering - Area E Airspace Increase - Landfill Area F Expansion - Area E Closure Turf Final Cover System
Infrastructure
Post-Bid
$1,000,000 est. value
Coatesville, PA
2023 Landfill Area E Stage 1 - Final Cover System Construction Project
Infrastructure
Post-Bid
$800,000 est. value
Honey Brook, PA
Chester County Solid Waste Authority (CCSWA) 2022 Solar
Infrastructure
Results
$300,000 CJ est. value
Narvon, PA 17555
HHW Subgrade Site Work
2022 Storm Drain Pipe Lining
Area E RSS and Cell 2B Construction
2021 Haul Road Resurfacing
2022 Area E - Cell 2B & MSE Wall Construction
Chester County Solid Waste Authority, Lanchester Landfill
Company Type: Agency
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Bob Watts | (610) | @.org | ||||||||
Christopher A Toevs | (610) | @.org | ||||||||
Robert Watts, S.C., BCEEM (Ext. 227) | (610) | @.org | ||||||||
Wesley Wagner | (610) | @.org |