Active Projects
Hurricane Harvey Drainage Repair Project - Phase I (Package A)
Infrastructure
Results
$550,000 est. value
League City, TX
De-Silting Drainage Channels
Infrastructure
Results
TX
Drainage Sediment Removal and Disposal (South)
Term Contract, Infrastructure
Results
TX
Repairs to the Storm Outfall Countywide for The Harris County Flood Control District
Drainage Improvements in the Cypress Place Subdivision (Phase 1) for Harris County Precinct 3
Drainage System Repairs in the Southeast Area for the Harris County Flood Control District
Construction of Pedestrian Sidewalks and Intersection Improvement at Red Bluff Boulevard from Spencer Highway to Fairmont Parkway
Greenwind Chase Drive Sidewalk
12" Waterline To Serve Water Treatment Plant No. 5
Water, Sewer, and Drainage Improvements for Cypress Heights Drive Street Dedication Sec 3 and Holderrieth Road Street Dedication Section 3
Complete Concrete
1919 South Kirkwood Road 168
TX, Houston 77077
(832) 573-6774
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Naser Salem | (832) | @.com | ||||||||
Shatha Darweesh | (832) | @.com |