Active Projects
Cliff Mountain Water Project (Phase 1- Blackgum Lane)
Infrastructure
Post-Bid
$640,000 est. value
Gate City, VA
Provide 5/8 Inch Through 1 1/2 Inch Cold Water Meters
Infrastructure
Results
VA
36 Sanitite Hp Triple Wall Pipe
Infrastructure
Results
O Fallon, MO
Steel Pipe
Distribution System Water Meter Upgrade
Ductile Iron Pipe for the South Main Truckstop Waterline Project
Sewer Extension Project at Greenfield
Consolidated Pipe & Supply Company
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Sean Vandergriff | (804) | @.com |