Active Projects
Hot Mix Asphalt Cold Milling and Resurfacing Concrete Pavement Repair, Sidewalk Ramps, Signing and Pavement Markings
Infrastructure
Post-Bid
MI
0.33 Mi of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Pavement Repair
Infrastructure
Post-Bid
MI
0.23 MI of Hot Mix Asphalt Shared-Use Path
Infrastructure
Post-Bid
MI
0.78 Mi of Hot Mix Asphalt Resurfacing, Concrete Curb and Gutter, Sidewalk, Sidewalk Ramps, Guardrail, Signing and Pavement Markings
12.82 Mi of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter, Sidewalk and Ramps, Drainage and Pavement Markings
1.54 Mi of Construction of a Roundabout Includes Hot Mix Asphalt Surfacing, Concrete Curb and Gutter, Storm Sewer and Pavement Markings
1.00 Mi of Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter and Ramps, Detail 7 Joint Repairs and Pavement Markings
Alvin Avenue Water Main and Pavement Replacement
Ten Mile Road Water Main and Sidewalk Near Wixom Road
PMC Project Concrete Pavement Repair on Woodard at 8 Mile
D Marco Contractors
200 West State Fair
MI, Detroit 48203
(586) 207-1732
Company Type: Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Anthony Macro | (586) | @.com |