Active Projects
Removal and Replacement of Six Concrete Box Culverts on IL 29 (Depue Spur)
Infrastructure
Results
$500,000 est. value
Replace the Double Barrel Box Culvert
Infrastructure
Results
$500,000 est. value
Sheffield, IL 61361
Wallace Street Reconstruction Phase II
Infrastructure
Results
$3,051,452 CJ est. value
Sterling, IL 61081
Remove Existing Bridge and Replace With Single-Span Precast Prestressed Deck Beam Bridge on Metal Shell Pile Ben Abutments and Other Collateral Work
Removal and Replacement of Six Concrete Box Culverts on IL 29 (Depue Spur)
Pavement Removal, 7" PCC Pavement, Sidewalks, Curb and Gutter, Storm Sewer, and Pavement Markings
Watermain Replacement
0.86 MI Along IL 40 - Standard Overlay, Milling and ADA Improvements from 0.1 Mi N of Lynn Blvd and 0.1 Mi n to 0.1 Mi s of Lefevre Rd Reconstruction and ADA Improvements from Lynn Blvd to 0.1 Mi N of Lefevre Rd in Sterling
Parking Lot Improvements
Reconstruct Terminal Area Ramp, Phase 2
Gensini Excavating Inc
10602 Highway 26
IL, Princeton 61356
(815) 659-1660
Company Type: Sub-Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Mike Garland | ![]() | (815) ![]() | ![]() | ![]() ![]() | ||||||
Mike Garland | ![]() | (815) ![]() | ![]() | ![]() ![]() |