Active Projects
Meadowlane Drive Reconstruction
Infrastructure
Post-Bid
$1,600,000 CJ est. value
Kentwood, MI 49508
Geers Intercounty Drain
Infrastructure
Post-Bid
$300,000 est. value
White Cloud, MI
Black River Canal/Port Huron Northern Bike Path
Infrastructure
Post-Bid
Port Huron, MI
Main Street Resurfacing Project
Freeway Signing Upgrades, Install Delineators and Pavement Markings on US-127
Non-Freeway Signing Upgrade on M-19 and M-90
110.00 MI of Delineator Removal and Installation on US-31 from the South Manistee County Line to the North Grand Traverse County Line, M-115 from M-22 To US-31 And m-37 from Peninsula Drive to the End of Route up the Old Mission Peninsula
Upgrade Intersection Signing
58.09 MI of Sign Upgrades at Appropriate Stop Control
Installation of Reflective Strips on Sign Supports Including Replacement of Missing Chevrons
Give 'Em A Brake Safety Inc
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Mike Rempalski | (616) | @.com | ||||||||
Shane Lemke | (616) | @.com |