Active Projects
Tupelo Main Street Fairpark Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Tupelo, MS 38804
HAB Taxilane Construction Project
Infrastructure
Post-Bid
$404,128 CJ est. value
Hamilton, AL 35570
Highway 12 Pedestrian and Lighting Improvements
Infrastructure, Alteration
Post-Bid
Lexington, MS 39095
FEMA Mitigation Project, Phase 2 Cemetery Creek Stabilization Project
East Corinth Window and Door Replacement
Roadway and Intersection Improvements (Grading, Drainage, Pavement, Widening, Pedestrian Sidewalk, Traffic Signs, and Traffic Stripe) on SR-171 at SR-18
Constructing the Widening, Micro-Milling, Resurfacing, and Traffic Stripe on Wall Triana Highway, Site 1 the Widening and Resurfacing on Graphics Drive, Site 2 and the Widening and Roadway Realignment on the I-565 Eastbound Off Ramp at Wall Triana Highway
18th Street South Revitalization
Sportsplex Parking Lot Paving
RV Campgrounds Improvements at Tishomingo State Park
Gregory Construction
Company Type: Sub-Contractor
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Aaron Gregory | (256) | @.com | ||||||||
Beth Pless | (256) | @.com | ||||||||
Brooke Bradford | (256) | @.com | ||||||||
Dahota Williams | (256) | @.com | ||||||||
Daniel Harrell | (256) | @.com | ||||||||
Hayden Peel | (256) | @.com | ||||||||
James Gill | (256) | @.com | ||||||||
Sam Jaynes | (256) | @.com |