Active Projects
Construction Engineering Services for Allen Road Grade Separation
Term Contract
Post-Bid
Detroit, MI 48226
Roadway Resurfacing Milepost 0 To 126 - Section 6 (2022)
Infrastructure
Results
Bridge Repairs and Resurfacing; Milepost 0 To 126 (2022)
Renovation, Infrastructure
Results
(6) - Right of Way Engineering and Access Design Term Agreements (Design H-1 Level B)