Active Projects
Avalon at Cypress, Section 8 Water, Sanitary Sewer, and Storm Sewer Facilities
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Houston, TX 77002
Construction of Water, Sanitary, and Drainage Facilities in Marvida Section 16
Infrastructure
Post-Bid
$561,992 CJ est. value
Houston, TX 77002
Construction of Water, Sanitary, & Drainage Facilities in Bridge Creek Section 13
Infrastructure
Results
$749,851 CJ est. value
Houston, TX 77002
Avalon at Cypress, Section 8 Reinforced Concrete Paving
Water, Sanitary, and Drainage Facilities in Marvida Sections 25 and 26
Construction of Paving Facilities in Marivda Section 16
Construction of Drainage & Paving Facilities for Westgreen Blvd. Street Ded. Sec. 6
Avalon at Cypress, Section 11 Water, Sanitary Sewer, and Storm Sewer Facilities (Rebid)
HC MUD 165 - Marvida South 8 Inch Water Line Interconnect
Construction of Drainage and Paving Facilities in Westgreen Boulevard Street Ded. Section 6
Harris County Municipal Utility District No. 165
Company Type: Agency
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Alan Bentson | (281) | @.com | ||||||||
Bryan Aguirre | (281) | @.com | ||||||||
Daniel Whitton | (281) | @.com | ||||||||
Darrell Hahn | (281) | @.com | ||||||||
Jessica Holoubek | (281) | @.com | ||||||||
John R. Dreahn | (281) | @.com | ||||||||
Kirby L. Taylor | (281) | @.com | ||||||||
Maurice Mullaly | (281) | @.com | ||||||||
Tyler Mueller | (281) | @.com |