Active Projects
Hacienda Avenue Fiber Optic Interconnect System from Decatur Boulevard to Polaris Avenue
Alteration
Bidding
$1,033,009 to $1,141,747 est. value
Spring Valley, NV 89113
Pipeline Replacement in Paradise Road Between Twain Avenue and Karen Avenue
Infrastructure
Bidding
$8,262,831 est. value
Las Vegas, NV 89119
Cactus Avenue from Fort Apache Road to Buffalo Drive
Infrastructure
Post-Bid
$22,574,243 est. value
Las Vegas, NV 89183
Refresh Edge Line and Centerline Striping
Remove and Replace Raised Pavement Markers on Various Routes
Las Vegas Boulevard - Tropicana Avenue to Flamingo Road (Phase E and F)
Annual Requirements Contract for Repair and Replacement of Crash Cushions
Annual Requirements Contract for Beltway Sign Maintenance
On-Call Pavement Markings and Signage
Refresh Striping
Highway Striping and Signs LLC
3425 Bunkerhill Drive
NV, Las Vegas
(702) 646-8003
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
James Redensek | (702) | @.net | ||||||||
Keith Shipley | (702) | @.net |