Active Projects
Early Childhood Center and Community Hall Design and Engineering (D and E)
New Construction
Post-Bid
Clifton, CO 81520
Architectural and Engineering Services On-Call
New Construction, Infrastructure
Post-Bid
Fort Collins, CO
Architect and Engineer Pre-Qualification and Open Enrollment
Renovation, Alteration
Post-Bid
CO
Architectural / Engineering / Consulting Service 2022 Academic Space Improvements
Early Childhood Education Center / IH19-121
Holland-Basham Architecture
2301 Blake Street- Suite 100
CO, Denver 80205
(720) 677-6537
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Thomas Berry | (720) | @.com |