Active Projects
Resurfacing on Various Routes in Pickwick Landing State Park
Infrastructure
Results
$469,499 CJ est. value
Counce, TN 38326
Construction of a Concrete I-Beam Bridge on Old Decherd Road, Including Grading, Drainage, and Paving
New Construction, Infrastructure
Results
$3,540,341 CJ est. value
Winchester, TN 37398
Resurfacing on U.S. 31
Infrastructure
Results
$2,190,409 CJ est. value
Oak Hill, TN 37220
Repair of the Bridges on U.S. 25W
Slide Mitigation on U.R. 25E, Including Grading, Drainage, Retaining Wall, and Paving
Construction of a Steel Girder Bridge on S.R. 339, Including Grading, Drainage and Paving
Grading, Drainage, and Paving on a S.I.A Route Serving Project Cardinal
Buckner Lane North Widening Project
Resurfacing on U.S. 412, U.S. 70, Including Bridge Expansion Joint Repair and Thin Epoxy Overlay
Resurfacing on S.r. 24, U.s. 70