Active Projects
0.20 MI of Concrete Pavement and Integral Pavement, Storm Sewer, Curb Ramps, Signing and Pavement Markings on Farmington Road from North of Orangelawn Street Northerly to Plymouth Road
Infrastructure
Post-Bid
Livonia, MI
0.59 MI of Concrete Sidewalk Widening, Ramps, Traffic Signal, Signing and Pavement Marking along Farmington Road from Grand River Avenue to Orchard Street
Infrastructure
Post-Bid
Farmington, MI
Traffic Signal Modernizations and Sidewalk Ramp Upgrades on Various Routes
Infrastructure
Post-Bid
East Tawas, Rose City, West Branch, MI
0.98 Mi of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Pavement Repairs, Curb Ramps, Signing and Pavement Markings
Concrete Box Culvert and Pipe
2022 Maintenance Dredging
6.75 Mi of Tree Clearing On Us-23 From Stony Creek Road to Ellsworth Road, Washtenaw County
11.80 Mi of Pavement Reconstruction, Active Traffic Management Installation, Grading and Drainage Improvements, Signing, Lighting, Landscaping, Bridge Rehabilitation (12 Structures) and Pavement Markings on i-96 From East of Kent Lake Road to the i-275 / i-696 / m-5 Interchange
Various Small Construction Projects within the Boundaries of Great Lakes and Ohio River Divisions
Kopas Construction, LLC
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Michael Kopas | (248) | @.com |