Active Projects
Remove Accumulated Silt from the Hogtown Creek Sediment Traps
Infrastructure
Results
$120,000 est. value
FL
Remove and Replace Two Concrete Cross-Drain Pipes
Infrastructure
Results
$150,000 est. value
FL
Stormwater Pipe Rehabilitation, Replacement, Desilting and Video Inspection
Infrastructure
Results
$425,000 est. value
Desilt and Video
BDI Drainage Improvements -SR 35 (US 301)
Replacement of Concrete Mitered End Sections
Remove Accumulated Silt
Non-Paved Shoulder Repair/Slope Repair and Bahia Sod
Pipe Lining, Repair, Desilting, and Video Inspection