Active Projects
Remove Built up Soil and Vegetation from the Outfall Ditches
Infrastructure
Results
$800,000 est. value
Stormwater Pond Clearing - Marsh Park
Results
Eustis, FL 32726
Clean Reshape the Outfall Ditches
Results
$350,000 est. value
FL
Remove Accumulated Silt
Desilt Box Culverts with Repairs
Concrete Ditch Repair and Sodding
Shoulder Rework and Culvert Pipe Desilt
Ditch Cleaning - Site Specific
Non-Paved Shoulder Repair/Slope Repair and Bahia Sod
Shoulder Repair