Active Projects
Kaw Lake Water Supply Program
Infrastructure
Post-Bid
Enid, OK
2021 Gas Main Extension
Infrastructure
Post-Bid
$100,000 est. value
Splendora, TX
Water Facilities Proposed 300,000 Gallon Elevated Storage Tank
Post-Bid
$1,500,000 est. value
Port Neches, TX 77651
7.125" IPS DR19 HDPE Gray Pipe
Annual Contract for Standard/Wide Range Repair Clamps, Tap Clamps and Couplings
Milford Companies
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Erik Elizondo | (210) | @.com | ||||||||
Michael Harris | (210) | @.com |