Active Projects
Sandy Point Pump Station Site Improvements
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Bryan, TX 77807
Roberto R. Bustamante WWTP Headworks Improvements Project Procurement Package 2.5
Infrastructure
Post-Bid
$944,000 CJ est. value
El Paso, TX 79927
Post Oak Wastewater Treatment Plant Equalization Basin Improvements
Infrastructure, Renovation
Post-Bid
$650,000 CJ est. value
Sherman, TX 75090
Transmission Main From Lonestar Road to Southpoint Drive
Lake Arlington Intake Buoy Replacement
Pump Station Design for the Cedar Creek Wetlands Project
Wastewater Treatment Plant Master Plan
Grand Junction Odor Control Improvements
30-Inch Transmission Main Crossing Highway 287 and Along Lone Star Road
El Paso Water Roberto R. Bustamante WWP Headworks Improvements
Perkins Engineering Consultants
6001 West Interstate 20219
TX, Arlington 76017
(817) 719-0372
Company Type: Engineer
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Aileen Roberts | (817) | @.com | ||||||||
Charlotte Smith | (817) | @.com | ||||||||
Cyndi Boyd | (817) | @.com | ||||||||
Damir Lulo | (817) | @.com | ||||||||
James McMillen | (817) | @.com | ||||||||
Justin Angel | (817) | @.com | ||||||||
Luke Goralski | (817) | @.com | ||||||||
Mark Perkins | (817) | @.com |