Active Projects
Mill and Fill with Other Improvements
Infrastructure
Post-Bid
$4,300,000 est. value
Harrison, NY
Replacement of ITS Equipment
Infrastructure
Results
Replacement of ITS Equipment
Infrastructure
Results
Traffic Signal Project, Install, Replace or Rehabilitate Traffic Signal Equipment
New Traffic Signal at the Intersection of Route 5/20 and Route 247 and Signal Upgrades
Signal Optimization: Wireless Vehicle Detection System
Traffic Signal Upgrades with Curb Improvements at Various Locations
Wrong Way Driving Sign Replacement at Various Locations
Pedestrian Action Safety Plan for Crosswalks
Power Line Constructors
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Jim Moorehead | (315) | @.com |