Active Projects
Resurfacing of 400 Block of North Virginia Ave
Post-Bid
Belleville, IL 62220
Patching on IL 130 and the Ramps at the ILL 130/I-70 Interchange
Results
Greenup, IL 62428
Intersection Improvements Including Replacement of Sidewalks
Results
Herrin, IL 62948
Schoolhouse Trail Pleasant Ridge Park Connector
Walnut Hill Cemetery "Niche" Improvements
Patching of Old Us 50 (Franklin Street)
2.9 Miles of Patching on IL 4 / IL 150 From IL 4 to the Eastern City Limits of Steeleville
Patching on I-55 at the Coalfield Rest Area
Culvert Replacements on IL 125 From 5.3 Miles West of IL 78 to 3.9 Miles West of IL 78
Patching on Lincoln Parkway in Lincoln
Prado Construction
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Cesar Prado | (618) | @.com |