Active Projects
Waterline Replacement Along Woodforest Boulevard, Phase I
Infrastructure
Results
$300,000 est. value
Channelview, TX 77530
Waterline Extension Along Hamill Road
Infrastructure
Results
Houston, TX 77039
10" Water Meter Installation On Proposed 12" Water Interconnect for Cunningham Tract
Infrastructure
Results
TX
12-Inch Water Line Extension
12-Inch Water Line Extension
ADA Ramp Improvements in the Yaupon Place, Frostwood, Oak Forest and Plantation Village Subdivisions
Greenwind Chase Drive Sidewalk
Vision Park Drainage Improvements
RJ&M Utility Construction LLC
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Jose Rangel | (281) | @.com |