Active Projects
Walker-Calloway Phase 2
Renovation
Design
$8,000,000 CJ est. value
Hurst, TX 76053
Lakeside Park Restroom Grinder Pump Station and Underground Utilities
Infrastructure
Post-Bid
$350,000 CJ est. value
Rowlett, TX 75088
Storm Drainage Improvements and Erosion Control at Various Locations - Phase C
Infrastructure
Post-Bid
$400,000 CJ est. value
Dallas, TX 75201
Timber Creek Pump Station Interceptor
Pre-Qualification for Professional Services for the Engineering Department-Period I
Manhole Replacement Project
June-Harrisee Water Main Replacements
IH-35E Utility Relocation Corporate Drive to Huffines Blvd
Walker-Calloway Branch Outfall Trunk Sewer System Phase 2 and 3 Improvements
Prequalification of Professional Wastewater Engineering Services
RJN Group, Inc. - Dallas
Company Type: Engineer
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Jim Jenks | (972) | @.com | ||||||||
Jose Maldonado | (972) | @.com | ||||||||
Mark Hinton | (972) | @.com | ||||||||
Mark Hinton | (972) | @.com | ||||||||
Rob Clark | (972) | @.com | ||||||||
Sylvester Ogidan | (972) | @.com | ||||||||
Terrace Stewart | (972) | @.com |