Active Projects
Sidewalk Extension Along Birnham Woods Drive
Infrastructure
Post-Bid
$500,000 est. value
Spring, TX 77386
Replacement of Three Bridges and One Culvert, with Bridges
New Construction, Infrastructure
Results
NC
EWP DSR 5038-503 Green Street Stream Bank Stabilization/ Wall Design
Infrastructure
Results
Fayetteville, NC 28301
EWP DSR 5038-502 Ann Street Bank Stabilization
Grading, Drainage, Paving and Structures
Repair and Maintenance to Hawley Lane Bridge
S&C Construction, LLC
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Ross Douglas | (713) | @.com |