Active Projects
Intersection Improvements (Grading, Drainage, and Pavement) on SR-8 (US-80)
Infrastructure
Post-Bid
$2,984,214 to $3,647,373 est. value
Livingston, AL 35470
Constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-241 from the Junction of CR143 to Mp 11.086 South of the Junction of SR-172 in Bear Creek
Results
$2,325,764 to $2,842,600 est. value
Bear Creek, AL
Constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe
Results
$8,229,190 to $10,057,898 est. value
AL
S T Bunn Construction (Fayette Plant)
SIC Code: 152103