Active Projects
Bituminous Materials and Seal Coat
Infrastructure
Post-Bid
Shelbyville, IL
2022 MFT Aggregate
Term Contract
Post-Bid
IL
Corrugated Steel Pipe Culvert
Infrastructure
Post-Bid
Shelbyville, IL
Aggregate
Aggregate
Furnishing Aggregate
Furnishing Pipe and Bands
Controlled Low Strength Material
Railroad Crossing Approach Reconstruction
Cold Spring Township Bridge Repair
Shelby County Highway
Company Type: Agency
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Alan Spesard, County Engineer | (217) | @.net |