Active Projects
Construction of the Texas A&M Indoor Track and Field facility
New Construction, Infrastructure
Design
College Station, TX 77840
Reservoir Pond at Citrus Center
Infrastructure
Post-Bid
$800,000 CJ est. value
College Station, TX 77840
Replace Main Electrical Distribution Panel at Lewis Hall
Renovation
Post-Bid
$180,000 CJ est. value
Kingsville, TX 78363
Base Bid-Replace Main Electrical Distribution Panel at Lewis Hall
Poly Pipe and Fittings Blanket Agreement
PCL Controller
RFP Construction Manager at Risk - AgriLife Vernon Campus Storm Repairs
Scroll Pump and Accessories
RFP - South College Ave Development Opportunity
Power Transformer for RELLIS Campus Substation
Texas A and M University
Company Type: Agency
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Angel Constancio | (979) | @.EDU | ||||||||
Angel Constancio | (979) | @.EDU | ||||||||
Antonio Kelly | (979) | @.EDU | ||||||||
Cathy Swanteson | (979) | @.EDU | ||||||||
Cherise Toler | (979) | @.EDU | ||||||||
Cindy Gillar | (979) | @.EDU | ||||||||
Cindy Gillar | (979) | @.EDU | ||||||||
Clyde Oberg | (979) | @.EDU | ||||||||
Crystal Russell | (979) | @.EDU | ||||||||
David Wilkinson | (979) | @.EDU | ||||||||
Jeff Zimmermann | (979) | @.EDU | ||||||||
Jimmy Dunn | (979) | @.EDU | ||||||||
Justin Rivera | (979) | @.EDU | ||||||||
Lindsay Weber | (979) | @.EDU | ||||||||
Lindsay Weber | (979) | @.EDU | ||||||||
Patty Allison | (979) | @.EDU | ||||||||
Patty Winkler | (979) | @.EDU | ||||||||
Ryon Walker | (979) | @.EDU | ||||||||
Sharon Parks | (979) | @.EDU | ||||||||
Sharon Parks | (979) | @.EDU | ||||||||
Shawna Kennedy | (979) | @.EDU | ||||||||
Stephen Wolfe | (979) | @.EDU | ||||||||
Steve Ward | (979) | @.EDU | ||||||||
Thomas Marek | (979) | @.EDU | ||||||||
Tiphany Bode | (979) | @.EDU | ||||||||
Trent Burford | (979) | @.EDU | ||||||||
Wes Wolfe | (979) | @.EDU |