Active Projects
Sprague Pump Station Pump Motors Replacement
Infrastructure
Post-Bid
$40,000 est. value
Narragansett, RI 02882
Automatic Meter Reading (AMR) System Installation Services
Infrastructure
Post-Bid
Less than $750,000 est. value
Sharon, MA
Water Meter Installation Program
Infrastructure
Results
Lynn, MA
Installation of Wastewater Check Valve at Seaport Pump Station
Lake Drive Pump Station Replacement
Advanced Metering Infrastructure (AMI) and Water Meter Installation Services
Advanced Metering Infrastructure (AMI) System Installation Services
Advanced Metering Infrastructure (AMI) System Installation Services
Large Water Meter Testing
Thielsch Engineering - Corporate Headquarters
Company Type: Engineer
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Bob Gaudette | (401) | @.com | ||||||||
Jeffrey Goulart | (401) | @.com | ||||||||
Laurie Gremour | (401) | @.com | ||||||||
Lewis Riopelle | (401) | @.com | ||||||||
Nicholas P Stralka | (401) | @.com | ||||||||
Thomas Lent | (401) | @.com |