Active Projects
Valve and Curb Boxes
Infrastructure
Post-Bid
PA
Installation of C900, DR14, Polyvinyl Chloride (PVC) Pipe Along Green Valley Road
Infrastructure
Post-Bid
$400,000 est. value
PA
Installation of C900, DR14, Polyvinyl Chloride (PVC) Pipe Across Nicholson Road and Driveway of the Girls Softball Complex for the Nicholson Road Connector
Infrastructure
Post-Bid
$700,000 est. value
PA
Installation of C900, DR14, Polyvinyl Chloride (PVC) Pipe for the Pinnacle Apartments
Installation of C900, DR14, Polyvinyl Chloride (PVC) Pipe and PEX-A Service Lines
Installation of 65' of 6" C900, DR14, PVC Pipe for the Perry Highway Dialysis Clinic
Installation of 2300` of 6" C900, DR14, PVC Pipe Along Kendall Avenue
Installation of 425` of 6" and 350` of 4" C900, DR14, PVC Pipe
Installation of 120` of 8" and 1880` of 6" C900, DR14, PVC
Installation of 970` of 6" and 630` of 4" C900, DR14, PVC