Similar Projects
HVAC Upgrades Building 753
Bidding
Denver, CO

Energy Management Controls System (EMCS) Technical Service Agreement
Bidding
Aurora, CO

Temperature Monitoring System
Post-Bid
Aurora, CO

General Mechanical / Hvac Construction and Preventative Maintenance Services
Post-Bid
Thornton, CO 80229

Air Traffic Control Chillers
Results
Aurora, CO 800119589

Dental School 3rd and 4th Fix Cooling Issues
Results
Less than $220,238 est. value
Aurora, CO 80045

Districtwide Refrigeration Maintenance and Repair Services
Bidding
CO

Fire Station 2 and Fire Station 4 Condenser and Heater Replacement
Post-Bid
$45,000 to $55,000 est. value
Aurora, CO 80012.

Lpsc Hvac Upgrade – Rtu Bid Package
Results
Less than $80,000 est. value
Westminster, CO

Design/Build for Replacement of Computer Room Air Conditioners (CRAC)
Post-Bid
Aurora, CO 80016

HVAC Water Treatment
Results
Aurora, CO

Heating, Air Conditioning, Ventilation Maintenance and Repair Services
Term Contract
Post-Bid
Aurora, CO 80012

CU Anschutz Repair Steam Condensate to Vault 2
Results
$100,000 est. value
Aurora, CO

N045--Domestic Water Heater Tubing for Rocky Mountain Regional VAMC
Post-Bid
Aurora, CO

Dental School Improve Exhaust Fan EF-2 on Roof
Results
Less than $176,510 est. value
Aurora, CO 80045

Reported 05/30/2020 12:00 AM
Project Title

Buckley AFB, CO - Comm Ducts to NOSC, B1301

Physical Address View project details and contacts
City, State (County) Aurora, CO 80012   (Adams County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of the installation of a new concrete encased communications duct bank system from Building 1301 at Buckley AFB, CO. The following disciplines are needed for this project include, but are not limited too; Existing Conditions, Concrete, Communications/Electrical, and Earthwork. Fiber is excluded from the scope of this project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents