Similar Projects
Last Updated | 04/14/2023 01:04 AM |
Project Title | Water System Improvements West Transmission Line & Center Road Water Line Extension |
Physical Address | View project details and contacts |
City, State (County) | Goldsby, OK 73093 (McClain County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,612,672 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Owner reserves the right to waive any informalities in the bidding and the right to reject any and all bids in accordance with the Oklahoma Competitive Bidding Act. Conditional bids shall not be accepted. The CONTRACTOR shall pay all applicable royalties and license fees, and shall defend all suits or claims for infringement of any patent rights and save the OWNER harmless from loss on account thereof, except that the OWNER shall be responsible for any such loss when a particular process, design, or product of a particular manufacturer or manufacturers is specified, however, if the CONTRACTOR has reason to believe that the design, process or product specified is an infringement of a patent, the CONTRACTOR shall be responsible for such loss unless the CONTRACTOR promptly gives such information to the ENGINEER Excavation and backfill for all buried pipelines and appurtenances to the lines and grades and at the locations shown on the plans. Stockpiling topsoil and subsoil on site. Removing surplus material from the trench and/or site to a site approved by the Owner. Placing and compacting granular beds and/or initial fills under and over pipelines, to rough grade elevations, and dewatering of trenches during installation. Placing and compacting final backfill to rough grade elevations. Incidental Work A Performance, Maintenance and Statutory Bond in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract, and the bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded to him Liquidated damages will be $300.00 per calendar day. The time for completion is 120 calendar days. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |