Similar Projects
Entry Modifications for 10 Elementary Schools
Renovation
Bidding
VA

Lockdown Window Shades
Term Contract
Post-Bid
VA

Construction Manager at Risk for Hardy Elementary School
New Construction - 106,000 SF
Post-Bid
Smithfield, VA

Liberty Middle School - HVAC and Ceiling Replace
Results
Ashland, VA 23005

Kitchen Renovation at John Adams Elementry School
Renovation
Results
$1,496,000 est. value
Alexandria, VA 22314

Fredericksburg Christian Elementary School
New Construction - 48,400 SF
Construction
$3,640,000 est. value
Fredericksburg, VA 22408

New Northwest Elementary School Project (McNair Elementary)
New Construction - 105,652 SF
Construction
$34,993,355 est. value
Falls Church, VA

Repair Water Intrusions, Building 567 JBLE
Post-Bid
$500,000 to $1,000,000 est. value
Hampton, VA 23665

Parking Lot Extension At Wells Elementary
Results
Chesterfield, VA

Classroom Additions - Grassfield Elementary School, Western Branch Primary School, and Greenbrier Primary School
Addition - 29,380 SF
Construction
$6,182,000 est. value
Chesapeake, VA 23321

Countertop
Post-Bid
Richmond, VA 23218

Fallon Park Elementary School Clinic Addition
Addition - 1,622 SF
Results
Roanoke, VA 24013

Douglas MacArthur Elementary School
New Construction - 150,000 SF
Construction
Alexandria, VA 22314

Catoctin Elementary School Three Classroom Addition
Addition
Post-Bid
Leesburg, VA 20175

Room Refurbishment
Results
Dahlgren, VA 22448

Last Updated 06/17/2021 12:52 PM
Project Title

Sound Panels and Installation

Physical Address View project details and contacts
City, State (County) Mechanicsville, VA 23111   (Hanover County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide materials and labor costs to install sound absorbing panels (Alpha Sorb Panel or equivalent) in the school gym. The gym is approximately 79,600 square feet. Panels shall be: Oriented vertically (portrait layout) on each wall. Panel Size: 48”x96”x1” Number of Panels: 60 Fabric Finish: FR701 Fabric Color: Baltic (153)

Details

1 Elementary School, Approximately 79,600 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents