Last Updated 03/06/2021 12:26 AM
Project Title

(1.1-Mile) SMART Resurfacing and ADA Improvements on US 12 (Main Street) from Wisconsin Street to IL 173 (Kenosha Street) in the Village of Richmond

Physical Address View project details and contacts
City, State (County) IL   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

20200100Cu YdEarth ExcavationBase Items22.000 20201200Cu YdRemoval And Disposal Of Unsuitable MaterialBase Items1.500 21101615Sq YdTopsoil Furnish And Place, 4"Base Items100.000 25000400PoundNitrogen Fertilizer NutrientBase Items2.000 25000600PoundPotassium Fertilizer NutrientBase Items2.000 25200110Sq YdSodding, Salt TolerantBase Items100.000 25200200UnitSupplemental WateringBase Items2.000 40600290PoundBituminous Materials (Tack Coat)Base Items10,841.000 40600400TonMixture For Cracks, Joints, And FlangewaysBase Items37.000 40600982Sq YdHot-Mix Asphalt Surface Removal - Butt JointBase Items157.000 40604062TonHot-Mix Asphalt Surface Course, Il-9.5, Mix "d", n70Base Items2,025.000 42001300Sq YdProtective CoatBase Items267.000 42400200Sq FtPortland Cement Concrete Sidewalk 5 InchBase Items1,440.000 42400800Sq FtDetectable WarningsBase Items90.000 44000155Sq YdHot-Mix Asphalt Surface Removal, 1 1/2"Base Items24,063.000 44000600Sq FtSidewalk RemovalBase Items1,440.000 44201815Sq YdClass d Patches, Type Ii, 14 InchBase Items275.000 44201819Sq YdClass d Patches, Type Iii, 14 InchBase Items100.000 44201821Sq YdClass d Patches, Type Iv, 14 InchBase Items50.000 48102100TonAggregate Wedge Shoulder, Type bBase Items90.000 50300225Cu YdConcrete StructuresBase Items3.000 50901760FootPipe HandrailBase Items20.000 60250200EachCatch Basins To Be AdjustedBase Items2.000 60252800EachCatch Basins To Be ReconstructedBase Items1.000 60262700EachInlets To Be ReconstructedBase Items3.000 60266600EachValve Boxes To Be AdjustedBase Items1.000 60300105EachFrames And Grates To Be AdjustedBase Items7.000 60300410EachValve Box Frames To Be Adjusted With New FramesBase Items2.000 60404950EachFrames And Grates, Type 24Base Items7.000 60406100EachFrames And Lids, Type 1, Closed LidBase Items11.000 66900200Cu YdNon-Special Waste DisposalBase Items25.000 66900530EachSoil Disposal AnalysisBase Items2.000 66901001l SumRegulated Substances Pre-Construction PlanBase Items1.000 66901003l SumRegulated Substances Final Construction ReportBase Items1.000 66901006Cal DaRegulated Substances MonitoringBase Items3.000 67000400Cal MoEngineer's Field Office, Type aBase Items6.000 67100100l SumMobilizationBase Items1.000 70102620l SumTraffic Control And Protection, Standard 701501Base Items1.000 70102622l SumTraffic Control And Protection, Standard 701502Base Items1.000 70102635l SumTraffic Control And Protection, Standard 701701Base Items1.000 70102640l SumTraffic Control And Protection, Standard 701801Base Items1.000 70300100FootShort Term Pavement MarkingBase Items5,295.000 70300150Sq FtShort Term Pavement Marking RemovalBase Items1,765.000 70300210Sq FtTemporary Pavement Marking Letters And SymbolsBase Items194.000 70300220FootTemporary Pavement Marking - Line 4"Base Items23,859.000 70300240FootTemporary Pavement Marking - Line 6"Base Items1,507.000 70300250FootTemporary Pavement Marking - Line 8"Base Items135.000 70300260FootTemporary Pavement Marking - Line 12"Base Items171.000 70300280FootTemporary Pavement Marking - Line 24"Base Items194.000 70300520FootPavement Marking Tape, Type Iii 4"Base Items2,648.000 78000100Sq FtThermoplastic Pavement Marking - Letters And SymbolsBase Items194.000 78000200FootThermoplastic Pavement Marking - Line 4"Base Items23,859.000 78000400FootThermoplastic Pavement Marking - Line 6"Base Items1,507.000 78000500FootThermoplastic Pavement Marking - Line 8"Base Items135.000 78000600FootThermoplastic Pavement Marking - Line 12"Base Items171.000 78000650FootThermoplastic Pavement Marking - Line 24"Base Items194.000 78100100EachRaised Reflective Pavement MarkerBase Items310.000 78300200EachRaised Reflective Pavement Marker RemovalBase Items310.000 88600600FootDetector Loop ReplacementBase Items38.000 x0320050l SumConstruction Layout (Special)Base Items1.000 x0549200FootCleaning Paved DitchBase Items528.000 x2020110UnitGrading And Shaping ShouldersBase Items66.000 x5537800FootStorm Sewers To Be Cleaned 12"Base Items100.000 x6030310EachFrames And Lids To Be Adjusted (Special)Base Items11.000 x7030005Sq FtTemporary Pavement Marking RemovalBase Items12,121.000 z0004562FootCombination Concrete Curb And Gutter Removal And ReplacementBase Items320.000 z0012450Cu YdConcrete StepsBase Items1.000 z0018500EachDrainage Structures To Be CleanedBase Items10.000 z0030850Sq FtTemporary Information SigningBase Items51.400 z0033700FootLongitudinal Joint SealantBase Items8,800.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents