Similar Projects
Wastewater System Improvements - 2022
Infrastructure
Bidding
$3,300,000 est. value
Joseph, OR

Shitike Creek Water Main Crossing - Warm Springs
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Warm Springs, OR 97741

Water System Improvements - Phase I - Collector Well No. 3 - 2022
Infrastructure
Post-Bid
$2,600,000 to $2,900,000 est. value
Boardman, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

Awbrey Butte Distribution Improvements
Alteration
Results
Bend, OR

Haines Water Compliance Project - Phase 3
Infrastructure
Bidding
$280,000 est. value
Haines, OR

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Nixyaawii One
Infrastructure
Results
$4,000,000 est. value
Pendleton, OR

Reload Facility Water Improvements
Infrastructure
Bidding
$200,000 est. value
Nyssa, OR

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Underground Utility Locating Services
Infrastructure
Bidding
$400,000 est. value
Lake Oswego, OR

Washington Way Advanced Utilities
Alteration
Post-Bid
Corvallis, OR 97333

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

Last Updated 05/30/2022 12:57 AM
Project Title

Dog River Pipeline Replacement

Physical Address View project details and contacts
City, State (County) The Dalles, OR   (Wasco County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project purpose is to replace an existing aging wood-stave pipeline. The Project contemplated consists of approximately 20,300 feet of new 30-inch Ductile Iron Pipe Size (DIPS) high density polyethylene pipe, air release and vent locations, new culvert at Brooks Meadow Creek, pipeline stream crossing at Brooks Meadow Creek, removal of existing fill where existing pipeline crosses through a depression, and new outfall energy dissipation facilities. Screening and fish passage facilities will be constructed as part of a separate contract and bid separately. Certain pipe materials are Owner-furnished. Work includes resurfacing certain existing dirt and gravel roads and construction of stormwater and erosion control facilities.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents