Similar Projects
Hudson River Water Reclamation Facility
New Construction
Bidding
GA

Main Street Pump Station Rehabilitation
Renovation
Bidding
Cartersville, GA

Naval Reserve Center Lift Station
Post-Bid
Columbus, GA

Bloomingdale 400,000 Gallon Elevated Water Storage Tank
Post-Bid
Savannah, GA

2016 Splost North Mainland Phase II Pump Station Improvements
Results
Brunswick, GA 31520

World-Wide Water Storage Tank Remediation
Term Contract
Results

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

Above Ground Pre-Stressed Concrete Tanks Insp/Rpr
Alteration
Bidding
GA

Lee Street Lift Station and Associated Improvements
Post-Bid
Valdosta, GA 31601

Replace Water Tank, Building 15003
Results
Claxton, GA

Elevated Tank Rehabilitation
Renovation
Post-Bid
Georgetown, GA

Industrial Park Division 3 - Elevated Water Tank
Results
Warner Robins, GA 31095

Elevated Water Tower
Post-Bid
Dudley, GA

Hampton Inn Lift Station
Results
Cornelia, GA 30531

Fairview Tank Exterior Painting
Post-Bid
Cartersville, Fairview, GA 30120

Last Updated 03/31/2022 09:16 AM
Project Title

North Fork Storage Tank and Pump Station

Physical Address View project details and contacts
City, State (County) GA 30324   (Fulton County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The North Fork Storage Tank and Influent Pump Station located at an existing GDOT facility on Sydney Marcius Boulevard 2. The Diversion Structure and Effluent Junction Box located along the North Fork of Peachtree Creek - Seeking qualified proponents to construct a 15MG sewer collection system storage. The storage facility is designed to capture wet-weather storm related runoff from major storm events that otherwise would result in SSO events die to sever collection system hydraulic overload.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents