Similar Projects
Territory Square Expansion Phase 1 - GG-29 - Town of Florence
Infrastructure
Conception
$2,500,000 est. value
Florence, AZ 85132

Bella Vista
Demolition, New Construction, Infrastructure
Conception
$90,000,000 CJ est. value
Casa Grande, AZ 85122

Casa Grande Industrial Development
New Construction, Infrastructure - 1,200,000 SF
Design
$60,000,000 CJ est. value
Casa Grande, AZ 85122

Casa Grande Industrial Development
New Construction, Infrastructure - 1,200,000 SF
Design
$60,000,000 CJ est. value
Casa Grande, AZ 85122

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Preservation
Infrastructure
Results
$6,300,000 est. value
AZ

Pinal Airpark Airfield Improvements - Phase I
Infrastructure
Results
$8,904,710 CJ est. value
Marana, AZ 85653

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Villas At Stonegate
New Construction, Infrastructure
Pending Verification
$120,000,000 CJ est. value
Maricopa, AZ 85138

Blossom Rock at Superstition Vistas
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Apache Junction, AZ 85120

Sherwood Park
New Construction, Infrastructure
Conception
$150,000,000 CJ est. value
San Tan Valley, AZ 85143

Quarters at Queen Creek Residences
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
San Tan Valley, AZ 85143

AutoZone #2777 / Apache Junction
New Construction, Infrastructure - 30,219 SF
Post-Bid
$1,500,000 CJ est. value
Apache Junction, AZ 85120

Last Updated 10/02/2023 02:32 AM
Project Title

Construct Roundabouts - Sr 287 and Sr 79b Intersection

Physical Address View project details and contacts
City, State (County) Florence, AZ 85132   (Pinal County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $6,469,512 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Tracs No: 0000 PN FLO Project No: FLO-0(201) T Termini: Town Of Florence Location: SR 287 AND SR 79B Route No. Milepost District Item No. N/A N/A Southcentral Local The amount programmed for this contract is $$8,900,000. The location and description of the proposed work are as follows: The proposed project is located in Pinal County where SR 287 and SR 79B meet at the southern section of the Town of Florence. Approximate length of the project is 0.73 miles. The work consists of adding a new multi-lane roundabout at SR 287 and SR 79B and a single-lane roundabout at SR 79B and Florence Heights Drive. The time allowed for the completion of the work included in this contract will be 284 Calendar days. The Arizona Department of Transportation, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252.42 U.s.c. 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 7.52 . This Contract Is Subject to the Provisions of Arizona Revised Statutes Section 42-5075 -- Prime Contracting Classification; Exemptions; Definitions. No Award Will Be Made to Any Contractor Who Is Not a Duly Licensed Contractor in Accordance With Arizona Revised Statutes 32-1101 Through 32-1170.03. All Labor Employed on This Project Shall Be Paid in Accordance With the Minimum Wage Rates Shown in the General Wage Decision. These Rates Have Been Determined in Accordance With the Requirements of the Law and Issued by the Secretary of Labor for This Project. The Wage Scale Is on File in Contracts and Specifications Section and Copies May Be Obtained at All Reasonable Times. A Proposal Guaranty in the Form of Either a Certified or a Cashier's Check Made Payable to the State Treasurer of Arizona for Not Less Than 10 Percent of the Amount of the Bid or in the Form of a Surety (Bid) Bond for 10 Percent of the Amount of the Bid Shall Accompany the Proposal. Surety (Bid) Bonds Will Be Accepted Only on the Form Provided by the Department and Only From Corporate Sureties Authorized to Do Business in Arizona. Questions and Comments Concerning the Bid Package for This Project Shall Be Directed to the Individuals Noted Below: Iqbal Hossain, P.e. Group Manager Contracts & Specification AZDOT - Construct Roundabouts - Sr 287 and Sr 79b Intersection Any questions received less than three working days prior to the bid opening date may not be answered.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents