Similar Projects
C-NS High School Community Pool Facility Construction
New Construction
Conception
Cicero, NY 13039

Salamanca CSD Improvements - Phase 3.3 and 3.4
Design
Salamanca, NY 14779

Roof and Interior Plaster Repairs at Patricia A. Dichiaro School 8
Renovation
Bidding
Yonkers, NY 10708

Mamaroneck UFSD - 2019 Bond Referendum - Capital Improvements at Mamaroneck High School - Phase 2
Renovation
Bidding
Mamaroneck, NY 10543

Peru CSD - 2018 Capital Project - Phase 3
Post-Bid
Less than $4,603,000 est. value
Peru, NY 12972

Building Renovations and Site Work at School 9
Renovation
Post-Bid
Yonkers, NY 10701

General Construction, Building Envelope and Restoration at Lincoln High School (DC)
Results
Yonkers, NY 10704

Renovations to School of the Arts
Renovation
Results
Rochester, NY 14614

Music Conservatory Facilities Improvement and Upgrades
New Construction - 3,500 SF
Construction
$1,000,000 est. value
White Plains, NY 10606

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Letchworth CSD 2020 Capital Improvements
Renovation
Bidding
$375,000 to $6,100,000 est. value
Gainesville, NY

Clarkstown CSD Time and Materials Project
Post-Bid
New City, NY 10956

Renovations to Francis Parker School 23 and Rise Community School No.106
Renovation
Results
Rochester, NY 14614

Germantown C.S.D. 2015 Capital Projects
Construction
Germantown, NY

Dunkirk CSD 2021-2022 Capital Outlay Project
Renovation
Bidding
$86,000 est. value
Dunkirk, NY 14048

Reported 02/23/2022 12:00 AM
Project Title

Spencer-Van Etten CSD 2021 Capital Improvement Project - Package A

Physical Address View project details and contacts
City, State (County) Spencer, NY 14883   (Tioga County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $600,000 to $1,400,000
Plans Available from Copy Center - 01/24/22
Owner View project details and contacts
Architect View project details and contacts
Description

Senior High School, - Reconstruction 60-08-01-04-0-010-016, Spencer Middle School, - Reconstruction 60-08-01-04-0-001-016. For the following contract: 1. General Trades - $1,400,000, 2. Mechanical - $1,400,000, 3. Plumbing - $600,000, 4. Electrical - $1,200,000, 5. Site - $850,000. The project consists of various capital improvements located at (2) two buildings throughout the District. Project Scope: Safety - High School - Replace wood siding with non-combustible material, non-ADA door handles, wire glass, fire alarm system including CO detection and add emergency lighting Upgrade PA/Master Clock system, electrical Add fire rated glass, window shading. Middle School - Replace PA and master clock system, wireglass, generator, transfer switch, emergency panels Reattach handrails Install emergency exterior lighting. Security - High School - Secure vestibule. Middle School - NOTE: Secure vestibule installation is part of the Smart Schools project being completed Summer of 2021, a separate project from the proposed Capital Project. Infrastructure - High School - Replace drainage structures, asphalt, softball infield, boilers, unit ventilators, rooftop units, control wiring, hot water piping, plumbing Re-brick, anchor brick panel, brick repointing. Middle School - Replace sidewalks, door frames, column bases, window shades, boilers, retro-commissioning, controls wiring, classroom unit ventilator Reattach loose ladders, rusted doors, brick repointing Repair locker room cracks, drywall ceiling, fire pump seals Install isolation valves Address water issue in basement and water infiltration at stair addition.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents