Similar Projects
Addition to Existing Athletics for Hartselle High School
Addition
Bidding
Hartselle, AL 35640

Lawrence County Athletic Facilities at Various Schools
New Construction
Bidding
Moulton, Town Creek, Trinity, AL 35672

Hitting Facility
New Construction
Post-Bid
Less than $350,000 est. value
Enterprise, AL

Sand Mountain Park and Amphitheater Miracle League Field
Post-Bid
Albertville, AL 35950

Orange Beach Recreation Complex New Gymnasium
New Construction
Results
Less than $1,263,674 est. value
Orange Beach, AL

Tuscaloosa County High School Softball Fieldhouse
Results
Less than $658,000 est. value
Northport, AL 35475

New Baseball and Softball Complex for Enterprise City Schools
Construction
Enterprise, AL 36330

Arab High School Football Field
Renovation
Bidding
Arab, AL 35016

Calera Sports Track and Field Building Project
Post-Bid
Calera, AL 35040

New Softball Concession Stand
New Construction
Results
Talladega, AL 35160

Calera Track and Field Completion Project
Post-Bid
Calera, AL 35040

New Baseball and Softball Fields for Cleveland High School Package B - Field-Complex Fit Out
Results
Cleveland, AL 35049

New Baseball Training Facility
New Construction - 9,900 SF
Post-Bid
Less than $439,000 est. value
Dothan, AL

Etowah County Mega Sports Complex
Results
Less than $5,079,798 est. value
AL

Summerdale Tennis Complex
Post-Bid
Less than $310,000 est. value
Summerdale, AL

Reported 02/26/2021 12:00 AM
Project Title

Basketball Practice Facility

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $5,800,000 to $6,600,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Renovate the current UAB Physical Education Gymnasium for Basketball Practice Courts and convert existing racquetball courts into 2 levels of offices and a locker room complex. The total square footage is approximately 30,000 SF. A lobby and a stairwell on the west end will be new construction. The first floor shall be players’ locker rooms, lounges, and meeting rooms. The second floor shall be coaches’ offices, and coaches’ dressing rooms.

Details

Fitness Center, 30,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents