Similar Projects
Sewer Lining Services for CSI Sewer Main
Infrastructure
Bidding
Hudson, NH

Water Sewer Inventory
Infrastructure
Bidding
Rochester, NH

Wastewater Utility Service FCI Berlin - 120 Months
Post-Bid
Berlin, NH 03570

Catch Basin Cleaning
Post-Bid
Rye, NH

2020 Sewer Main Lining Project
Results
Lebanon, NH

Catch Basin Cleaning
Term Contract
Results
Derry, NH

2021 Catch Basin Cleaning
Term Contract
Post-Bid
Atkinson, NH

Catch Basin / Drain Pipe Cleaning and Inspection Program
Results
Manchester, NH

Woody Hollow Water, Sewer, & Drainage Improvement Project
Renovation
Post-Bid
Boscawen, NH 03303

2021-2023 Catch Basins Cleaning
Term Contract
Results
Alton, NH

Catch Basin Cleaning 2021
Term Contract
Post-Bid
Hollis, NH

Paul Brook Pump Station Force Main Upgrade
Results
Less than $997,000 est. value
Newington, NH

2022 Catch Basin/Culvert Cleaning
Infrastructure
Post-Bid
Sunapee, NH

Liquor Commission Headquarters Sewer Repair
Results
Less than $155,000 est. value
Concord, NH 03301

Catch Basin Cleaning 2020
Results
Hollis, NH

Last Updated 11/05/2021 09:38 AM
Project Title

Waste Line Replacement

Physical Address View project details and contacts
City, State (County) Nashua, NH 03062   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace the 4” cast iron waste piping from the interior bathrooms to the exterior sewer connection with approximately 80 linear feet of underground Schedule 40 PVC 4” piping. There are 5 water closets, 1 urinal, and 7 lavatories involved, which are intended to be reused. It is assumed that there is cast iron piping within walls, however that has not been confirmed. The project includes the replacement of cast iron waste piping connecting the water closets, urinal and lavatories to the main waste line as well as main waste line with PVC piping and reconnect to existing venting.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents