Similar Projects
0.23 MI of Hot Mix Asphalt Shared-Use Path
Infrastructure
Bidding
MI

0.20 MI of Concrete Sidewalk and Ramps and Storm Sewer Along Palmer Road
Infrastructure
Bidding
Westland, MI

Residential Development of City-Owned Lots
Post-Bid
Highland Park, MI

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Big Rapids, Canton, Fort Gratiot, Gaylord, Holland, Muskegon, Rochester Hills, Southgate, Sterling Heights, Warren, Ypsilanti, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

Public Safety Parking Lot Reconstruction
Results
Taylor, MI

Northline Sidewalk Project
Post-Bid
Taylor, MI

PCCS Parking Lot- Bid Package 19
Results
Plymouth, MI

Traffic & Safety Parking Terminals And 3 Yr. Contract
Post-Bid
Detroit, MI

Iron Belle Trail: Phase 2 Trailhead and Phase 1 Loop Trail
Results
Detroit, MI

2020 Sidewalk Gaps and Replacement Program
Post-Bid
Plymouth, MI

Envision Center HVAC, Improvement/Accessibility Modifications
Results
Inkster, MI

ADA Restrooms Renovation Project (CDBG)
Term Contract
Post-Bid
Redford, MI 48239

Garden City High School Orchestra Pit Platform
Results
Garden City, MI 48135

Construct Green Infrastructure Improvements To The Property Located At 4401 Conner St
Post-Bid
Detroit, MI 48200

Last Updated 07/01/2021 12:32 PM
Project Title

New Center Rail Terminal - ADA Remediation

Physical Address View project details and contacts
City, State (County) Detroit, MI 48202   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes exterior and interior improvements related to accessibility at the New Center Rail Terminal. Exterior work includes asphalt and concrete replacement, accessible parking and routes, installation of handrails and markings. Interior improvements include new aluminum storefront doors, new hollow metal doors, hardware, toilet fixtures and accessories, finishes including fiber reinforced panels in the toilet rooms, vinyl tile, rubber base and stair covering and painting. Modifications to the ticket counter to provide an accessible counter. New ballistic glass at the accessible counter. New signage.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents