Similar Projects
Van Nuys and Voss Mixed Use Development
New Construction, Infrastructure, Alteration - 86,550 SF
Design
Los Angeles, CA 91405

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Gardena Boulevard Street Improvement from Figueroa Street to East of Avalon Boulevard
Renovation
Bidding
$3,458,350 est. value
Gardena, CA 90248

Airport Avenue Improvements Project
Infrastructure
Bidding
$5,000,000 est. value
Santa Monica, CA 90405

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

Campus Wayfinding and Signage Plan
Alteration
Results
La Verne, Walnut, CA 91789

Paving Of Residential And Major Streets Rehabilitation Project
Infrastructure
Results
$1,500,000 est. value
Baldwin Park, CA 91797

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure - 195,000 SF
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Services for Pavement and Curb Cutting
Infrastructure
Bidding
$300,000 est. value
Los Angeles, CA

Traffic Signal & Street Lighting Equipment
Infrastructure, Alteration
Post-Bid
Long Beach, CA 90899

Install Wired Mesh Drapery System and Slope and Roadside Paving
Infrastructure
Results
$2,880,000 est. value
CA

Michigan Avenue Greenway and 20th Street Project
Infrastructure
Bidding
$1,357,000 est. value
Santa Monica, CA

Valley View Avenue & Rosecrans Avenue Intersection Improvements
Infrastructure
Post-Bid
$617,000 to $620,000 est. value
Santa Fe Springs, CA 90670

Expo Center Roads Rehabilitation
Infrastructure
Results
$832,000 est. value
City of Industry, CA

Reported 06/08/2022 12:00 AM
Project Title

Old Topanga Canyon Road / Mulholland Highway Improvements Project

Physical Address View project details and contacts
City, State (County) Calabasas, CA 91301   (Los Angeles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project to be constructed consists of 1650 feet road improvements on Mulholland Highway from Old Topanga Canyon Road West to Old Topanga Canyon Road East and Old and 200 feet road improvements on Old Topanga Canyon Road West. Improvements include shoulder widening, sidewalks, pavement rehabilitation, storm drain improvements, retaining wall, erosion control, new traffic signal and traffic signal modification, water facility relocation and Wild Walnut Park parking lot improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents