Similar Projects
Skyland Town Center Phase II
New Construction - 503,600 SF
Conception
$10,000,000 CJ est. value
Washington, DC 20020

Capitol Building Redevelopment
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC

Bearden Arts Building
New Construction - 26,000 SF
Design
Washington, DC 20002

H Street Condominiums & Retail
New Construction - 1,500 SF
Design
Less than $500,000 CJ est. value
Washington, DC 20002

2100 M Street NW
New Construction, Renovation, Addition - 420,244 SF
Bidding by Invitation
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20037

2100 M Street NW
New Construction, Renovation, Addition - 420,244 SF
Bidding by Invitation
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20037

Leroy Place Offices
Renovation - 5,134 SF
Post-Bid
Washington, DC 20008

Pension Benefit Guaranty Corporation Offices
Renovation - 433,000 SF
Post-Bid
Washington, DC 20024

GSA 11 D/B 6th Floor Short Wing Modernization at the New Executive Office Building
Results
$1,000,000 to $5,000,000 est. value
Washington, DC

7th Floor Spec Suite
Renovation - 4,520 SF
Results
Washington, DC 20005

Akridge at Half - Residential
New Construction - 311,000 SF
Construction
$10,000,000 CJ est. value
Washington, DC 20003

Walter Reed Town Center Phase I
New Construction - 107,000 SF
Construction
Washington, DC 20004

Freedom Forum
Build-Out - 26,000 SF
Pending Verification
Washington, DC 20001

Columbian Quarter
New Construction - 1,750,000 SF
Pending Verification
$10,000,000 CJ est. value
Washington, DC

9th and V Street Apartments
New Construction - 230,000 SF
Conception
$10,000,000 CJ est. value
Washington, DC 20001

Last Updated 06/30/2020 10:47 AM
Project Title

2100 L Street Offices

Physical Address View project details and contacts
City, State (County) Washington, DC 20037   (District of Columbia County)
Category(s) Commercial
Sub-Category(s) Office, Retail
Contracting Method
Project Status Construction Commenced July 2018, Construction Complete as of April 2020
Bids Due View project details and contacts
Estimated Value $47,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, 1 Office, 190,000 SF Renovation, Office, 10 Stories Above Grade, 190,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents