Similar Projects
Hodgdon High School Paving Project
Bidding
Hodgden, ME 04730

Road Paving
Bidding
Saint Agatha, ME

Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Asphalt Street Paving - 2019
Post-Bid
Houlton, ME

(LCP) Light Capital Paving
Results
Less than $1,200,000 est. value
Baldwin, Bridgton, Casco, Fryeburg, Lovell, Naples, Sebago, Sweden, Waterford, ME

(LCP) Light Capital Paving
Results
Less than $840,000 est. value

2020 Paving Project
Bidding
Madawaska, ME

Frenchville Paving 2019
Post-Bid
Frenchville, ME

(LCP) Light Capital Paving
Results
Less than $2,700,000 est. value

Paving Bid
Post-Bid
Mapleton, ME

(LCP) Light Capital Paving
Results
Less than $1,000,000 est. value
ME

Roads Grading Street Sweeping Heating
Post-Bid
Island Falls, ME 04747

Crack Sealing
Results
Less than $100,000 est. value
Fort Fairfield, Fort Kent, Frenchville, Limestone, ME

Patching and Paving at the Caribou High School Campus
Post-Bid
Caribou, ME 04736

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $1,500,000 est. value
Houlton, Littleton, ME

Last Updated 03/07/2019 07:04 AM
Project Title

Pavement Milling Ultra Thin Bonded Wearing Course Overlay with Drainage and Safety Improvements

Physical Address View project details and contacts
City, State (County) Caribou, Grand Isle, Van Buren, ME   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,340,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Pavement Milling, Ultra-Thin Bonded Wearing Course Overlay, with Drainage and Safety Improvements, and other incidental work.Location: In Aroostook County; Project No. 2395500: US Route 1 in Van Buren beginning 0.09 miles south of the Van Buren Town Line and extending 3.71 miles in Grand Isle. Project No. 2395700: US Route 1 in Caribou beginning 0.83 miles north of Route 89 and extending north 9.22 miles into Connor TWP. Project No. 2395900: US Route 1 in Connor TWP beginning 0.86 miles north of the Sheen Road and extending northerly 11.02 miles to US Route 1A in Van Buren.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents