Similar Projects
Chlorination Updates - Hancock Well and Oak Street Well Projects
Bidding
Midvale, Sandy, UT 84094

South Well Chlorinator Upgrade 2020
Bidding
Grantsville, UT

Ledges 1 and Tolman 4 Water Well Cathodic Protection System
Post-Bid
Saint George, UT

Mexican Hat SSD Well Improvements
Post-Bid
Mexican Hat, UT

Water System Drilling, Construction and Testing
Results
Heber, UT

F--New Westwater Well
Results
$100,000 to $250,000 est. value
Cisco, UT

Culinary Well Drilling 2021
Bidding
Mount Pleasant, UT

Construction of the Coldwater Well Improvement Project
Post-Bid
Mendon, UT 84325

Milford Culinary Well Drilling Project 2019
Results
Less than $549,205 est. value
Milford, UT 84751

Construction of the Valley Elementary Well Equipping
Bidding
$50,000 est. value
Eden, UT 84310

Ras Pump System
Post-Bid
Provo, UT 84601

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Alpine City Cup Filter Station Project
Bidding
Alpine, UT

Drilling, Construction and Testing of the Proposed Stewart Ranches Well
Post-Bid
Francis, UT 84036

Refurbishment and Upgrade of Well #4
Results
Less than $100,000 est. value
West Jordan, UT

Last Updated 04/07/2021 02:01 PM
Project Title

Drilling Rig and Services for Forge

Physical Address View project details and contacts
City, State (County) Milford, UT   (Beaver County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a fully equipped drilling rig, manpower and additional equipment to conduct drilling and completion operations for a 9500 foot well, at a site located approximately 10 miles north of Milford, Utah, as shown in Attachment B. The drilling program and well configuration are expected to be generally as described in Attachment C. The specifications in Tables 1 and 2, below, represent the best estimate of the minimum requirements for a rig to safely and efficiently drill, complete and perform testing operations for the well as currently designed. Vendor shall submit a rig equipment list for the proposed rig.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents