Similar Projects
Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

2022 Water Division Concrete And Manhole Repairs (Various Locations)
Alteration
Results
Warren, MI

Armada Area Schools Concrete 2022
Alteration
Post-Bid
$200,000 est. value
Armada, MI

Roadside Materials, Release and Delivery as Required - New Haven
Term Contract
Post-Bid
New Haven, MI 48048

Diane Lane Reconstruction
Infrastructure
Results
$201,129 CJ est. value
Richmond, MI 48062

Six Months of Crushed Concrete, Release and Delivery as Required
Term Contract
Post-Bid
Mount Clemens, MI 48043

2023 Shelby Township Library - Accessible Parking Addition
Infrastructure
Results
$28,115 CJ est. value
Shelby Township, MI 48316

Year 1 Pathways
Infrastructure
Post-Bid
$350,000 CJ est. value
Washington, MI 48094

Cambridge Courts Pavement Maintenance
Infrastructure
Results
$150,020 CJ est. value
Fraser, MI 48026

Meadows-Mulvey Farms Joint Repairs
Infrastructure
Results
$513,030 CJ est. value
Fraser, MI 48026

Roadside Materials, Release and Delivery as Required
Term Contract
Post-Bid
New Baltimore, MI 48051

Roadside Materials, Release and Delivery as Required - Washington Township
Term Contract
Post-Bid
Washington, MI 48094

Ohio #9 Limestone
Term Contract
Post-Bid
Warren, MI 48093

Northview Street Pavement Reconstruction - CDBG
Infrastructure
Results
$903,268 CJ est. value
Roseville, MI 48066

2023 Municipal LED Lighting
Infrastructure
Post-Bid
$100,000 CJ est. value
Washington Township, MI 48094

Last Updated 07/11/2023 05:06 PM
Project Title

Fy 2023 Cdbg Sidewalk Ramp Improvements Van Dyke Avenue-Hayes Road (CDBG Project)

Physical Address View project details and contacts
City, State (County) Shelby Township, MI 48315   (Macomb County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $157,159 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000318683 The work proposed consists of the installation and construction of new ADA sidewalk ramps on 23 Mile Road from Van Dyke Avenue to Hayes Road. The approximate quantities of work involved for this project are as follows: Curb Ramp, Conc, 4 inch 3,486 Sft Curb Ramp, Conc, 6 inch 969 Sft Curb Ramp, Conc, 8 inch 1,264 Sft and related appurtenances, as well as traffic control and maintenance, clean-up, and restoration Bid security: A certified check, bank draft or satisfactory bid bond, executed by the bidder and a surety company, payable to the Charter Township of Shelby, in the amount equal to five percent (5%) of the bid, shall be submitted with each bid. Purchase Type: One Time Only- Delivery Date: Upon Award

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents