Similar Projects
Airport Landside Terminal Parking Lot - City of Auburn
Infrastructure
Conception
$250,000 CJ est. value
Auburn, ME 04210

Airport Landside Terminal Parking Lot - City of Auburn
Infrastructure
Conception
$250,000 CJ est. value
Auburn, ME 04210

Brickyard Commons - Auburn
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Auburn, ME 04210

Brickyard Commons - Auburn
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Auburn, ME 04210

2022 Davis and White Streets Paving and Sidewalk Improvements
Infrastructure
Bidding
$320,000 CJ est. value
Lewiston, ME 04240

2022 Davis and White Streets Paving and Sidewalk Improvements
Infrastructure
Bidding
$320,000 CJ est. value
Lewiston, ME 04240

2022 Crack Sealing Program
Infrastructure
Post-Bid
Auburn, ME

Ferry Road Roadway Improvements
Infrastructure
Post-Bid
$430,000 est. value
Lisbon, ME 04250

Intersection Improvements
Results
Auburn, ME 04210

2021 Reconstruction Project
Results
Less than $2,000,000 est. value
Auburn, ME

Gauvreau Place
New Construction - 40,400 SF
Construction
$4,000,000 est. value
Lewiston, ME 04240

Walnut Street Apartments
New Construction - 3,383 SF
Construction
$2,592,000 est. value
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Construct Corporate Hangar - City of Auburn
New Construction, Infrastructure
Conception
$975,000 CJ est. value
Auburn, ME 04210

Last Updated 11/14/2022 09:10 AM
Project Title

Picker House Lofts

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $22,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is apart of a re-development of a former cotton mill into a mixed-use building for affordable apartments, light industrial and office purposes. This is the first building and plans will include 74- units. As of July 20, 2022, this project is in schematic design, and was granted MaineHousing funds. The project received approval from the Planning Board for the City of Lewiston on June 14, 2021. An architect and a construction manager have been selected. Construction is expected to begin in fourth quarter 2022, with completion in the fall of 2023. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time.

Details

Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents