Similar Projects
Herbicide Application at 17 Sites - MN, WI and IA
Term Contract
Design

Tree and Stump Removal
Post-Bid
$17,550 est. value
WI

UW - Stevens Point at Wausau Parking Lot Reconstruction
Post-Bid
Wausau, WI 54401

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

North 4th Avenue Improvements
Results
Less than $750,000 est. value
Abbotsford, WI 54405

Landscape Maintenance Services 2021
Post-Bid
Wausau, WI

2021 Street and Utility Improvements
Results
$95,000 est. value
Edgar, WI

Caroline Street Reconstruction LRIP
Post-Bid
Athens, WI 54411

Airport Surfacing
Results
Brookfield, Janesville, Lancaster, Tomah, Waukesha, Wausau, Woodruff, WI 53072

Resurfacing of Nolan Road
Post-Bid
WI 54408

2021 Street Improvements
Results
Less than $124,000 est. value
Edgar, WI

Blacktop
Infrastructure
Post-Bid
Athens, WI

2021 Street Construction Project A
Results
Wausau, WI

County Road X Mill and Overlay
Infrastructure
Post-Bid
Wausau, Weston, WI 54403

2021 Street Construction Project B
Results
Wausau, WI

Last Updated 06/24/2022 01:09 AM
Project Title

Community Center Drive Rehabilitation Project Phase 1

Physical Address View project details and contacts
City, State (County) Weston, WI 54476   (Marathon County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Landscaping/Irrigation, Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Village of weston - community center drive rehabilitation project phase 1 (Phase 1) - Traffic Control, Storm Sewer Inlet Rehabilitation/Adjustments, Concrete Pavement, Curb, Sidewalk/Driveway Approaches removal/replacement and Landscaping/Restoration Work Items. Contract Documents are on file and may be examined at the Weston Municipal Center. Prequalification statement forms for this project must be submitted to the Village by 4 p.m. local time Friday June 3rd, 2022. These forms must show sufficient financial ability, equipment, and experience to properly perform the Contract in accordance with Section 66.0901(2) Wisconsin Statutes. The Village of Weston's decision as to the qualifications shall be final. Proposals shall be accompanied by a certified check or bid bond in the amount of the Bidder's maximum bid price, payable to the Village of Weston as a guarantee that the bidder, if the bid is accepted, will execute and file the proposed contract and bonds within 15 days of the award of the contract. The certified check is returnable to the bidder immediately after signing the contract, and acceptance by the Village of Weston of the bonds. The Village of Weston reserves the right to reject any or all bids, or to accept any bid deemed to be in the best interest of the Owner. The Village of Weston also reserves the right to waive any irregularities or informalities in the bidding. Bids shall remain acceptable for a period of ninety (90) days.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents